Case Study 1
Institute of technology
Syracuse, NY
EXTERIOR BEFORE
EXTERIOR after
Concept Design
- Determine critical adjacencies
- Verify program for addition vs. existing building
- Determine which spaces need to be one first floor
1
Plan Development
- Verify room program
- Study flexible space and shared functions
- Analyze display options by curriculum area
2
lobby
Elevation Concepts
- Create focal point lobby and reception
- Face city skyline
- Gathering space for activities and competitive athletic events
3
Program Study – Culinary Kitchen
- Culinary kitchen for student use
- Students can sell goods in café to faculty and public
- Culinary classroom allows for demonstration from kitchen
4
GYMNASIUM before
New GYMNASIUM after
Design Challenges
- Poor natural light
- Non-code compliant exiting
- Low floor to floor heights
- No defined entry
5
Signature program spaces
- Auto shop
- Café
- Culinary Kitchen
- TV studio
- Gymnasium
- New Entrance
6
SEI can take your future plans and make them possible every step of the way.
Contact US Today!